Parks & Recreation: News

Posted on: November 21, 2017

Elk Grove/West Vineyard and Central Elk Grove Area Park Survey Information

Park surveys were mailed to residents residing in the Elk Grove/West Vineyard (Benefit Zone 3) and Central Elk Grove (Benefit Zone 6) on November 9. This survey is to gauge property owner’s willingness to increase their Landscape and Lighting annual assessment to pay for the increased cost of maintenance of local parks and streetscape areas within Benefit Zones 3 and 6. 

Staff will present survey results at a future CSD Board Meeting and receive direction from the Board of Directors whether to conduct a local funding measure balloting process as required by Proposition 218 (PDF). If directed to proceed with a local funding measure balloting process, an informational campaign will be conducted including public outreach meetings.


The 2017-18 Park Operations budget is funded by Landscape and Lighting assessments. 

2017-18 Fiscal Year District-Wide Landscape and Lighting Assessment District (PDF) 

2017-18 Fiscal Year District-Wide Landscape and Lighting Assessment District Engineer’s Report (PDF)


More information about the individual Benefit Zones within the Landscape and Lighting Districts, funding challenges, projects and amenities can be found in the Park Maintenance Management Plan (PDF).


The following informational packages were mailed with the surveys:

Benefit Zone 3 Information Sheet (PDF)

Benefit Zone 6 Information Sheet (PDF)

Facebook Twitter Google Plus Email

Other News in Parks & Recreation: News